MTA Design-Build Services for Main Cable Dehumidification – Verrazzano Narrows Bridge

  • Contract #: VN-8Q
  • Budget: 258,180,760.00 USD
  • SOW: Installation of Main Cable Dehumidification System. Replacement of Cable Band Bolts. Internal Cable Inspections. Replacement of Messenger Cables. Replacement of Aerial Obstruction Lights and supports. Installation of Access Platform. Installation of Acoustic Monitoring System. Replacement and painting of all hand ropes and stanchions.